Camp Minden Documents
- 01 Revised Redbag Workplan, 5.23.18
- Attachment C Ash Analytical
- Attachment J H2Bravo Project Health and Safety Plan, Final
- Attachment J1 ESI HASP-10July2015
- Read Me for Public Comment
- Camp Minden M6 Removal Site Closure Plan
- Contract Notice to Proceed
- Contract
- Contract Attachment A1 ESI Proposal (Final)
- Contract Attachment A2 Workplan Kiln-CBC (ESI Final)
- Contract Attachment A3 Health and Safety Plan (ESI)-Final-3-17-15
- Contract Attachment A4 ESI Proposal Appendix
- Contract Attachment B to D
- Contract Attachment E to SOV
- Contract Attachment 1
- ASHanalyticalcomplete (05May16)
- Ashanalytical (Metal) (16May16) (002)
- BackgroundAnalyticalSummary (02212016) (04122016) Locations
- BackgroundAnalyticalSummary (02212016) (04122016) Overall
- BackgroundRTSummary (02212016) (04122016)
- Army Tav Report 4 to 5 Oct 16 Final Report 2016-10-11-164624
- Camp Minden CBI Disposal Public Information Briefing v7 161012